You are in charge of a high tech robotic assembly. There are six stations that are in charge of the different name parts A through Z. Each station is soley responsible for those named parts. On the morning of testing the new production line, one of the robot did not boot properly. Since you are in charge, you asked the six stations what they did during the installation, and all insisted they installed the parts as spedified. After looking at the part's login chart from the diagnostic computer, you found the following installation below. Name which is the defective part and which stations are at fault?
1) Station 1: install parts g,h,f,w, and e; which are head components of the robot.
2) Station 2: install parts p,n,m,x, and o; which are arms components.
3) Station 3: install parts c,a,d, and b; toro components.
4) Station 4: install parts i,k,j, z, and l; leg componets.
5) Station 5: install parts r,s,q, and t; robotic hard drive.
6) Station 6; install parts v, u, and w; electrical components.